Only in 2020 we have completed the following tasks:
- Ad hoc and emergency repairs of water and steam pressure boiler parts, high and low voltage devices and networks and accompanying devices
- Ad hoc and emergency repairs of steam boilers (pressure part) with pressure installation
- Modernisation/renovation of K1 boiler in Jaworzno III Power Plant
- Prefabrication, delivery and assembly of boiler installations, flue ducts, modernisation of second-level gas station, prefabrication and development of new first-level gas station and modernisation of transformer rooms, switching station and boiler control room for the modernised KP6 and KP7 steam boilers in EC-3 Głogów Division
- Development of bypass pipelines in the area of P-26 Division
- Emergency repair of biomass boiler in Ostrołęka
- Pressure part renovation of OP 650 050 boiler and high-pressure boilers connecting the boiler with turbine for PGE GiEK S.A. Dolna Odra Power Plant – Block No. 7
- Repair of scrubber circulation in the Głogów smelter
- Works on rotary air heaters of the K2 boiler in power and heat plant in Wrocław
- Repair of rotary air heaters of the K1 boiler in power and heat plant in Wrocław
- Replacement of carrier and pilot bearing and removal of small defects in both above-mentioned heaters upon renovation of the KW3 boiler
- Assembly works upon the modernisation of support structures of coaling trestles in the Wrocław power and heat plant
- Assembly and welding works upon renovation of K2 boiler in the Wrocław power and heat plant
- Replacement of regasification unit – mechanical and anticorrosive passage necessary for the technological reasons of LNG Świnoujście
- Assembly works in the scope of replacement of balancing flows in the Czechnica and Wrocław power and heat plants
- Welding and assembly works at the facilities of Kogeneracja in the Czechnica and Wrocław power and heat plants
- Replacement of steel elbows of boiler pressure part in power and heat plant in Toruń
- Emergency repair of boiler of Ostrołęka Power Plant
- Replacement of compensators in skewed duct of Solinox installation in the Legnica smelter
- Construction of high-efficiency cogeneration system based on gas engines of electrical power at 8MW with the possibility to produce coolness with necessary infrastructure in Ujeździec Mały.
- Completion of works at Stora ENSO Ostrołęka
- Repair of pressure part of boilers type OP 650 050 in Dolna Odra Power Plant on Block No. 5
- Repairs of boilers type OP 650 050 in Dolna Odra Power Plant on Block No. 5
- Reconstruction of KOX heat exchanger in PGE Gorzów Wielkopolski
- Prefabrication of two KT water collectors and delivery
- Replacement of re-gasification unit – mechanical and anticorrosive works necessary for the technological reasons of LNG Świnoujście
- Completion of technological installations (including disassembly and assembly) – works inside gas boiler house within the II Stage of Investment – after development of 2 gas boilers in September 2020
- Maintenance service and ad hoc repairs of blowers installed at IPK of P-1 Division
- Supervision over repair works on rotary air heaters of K-6 boiler in Rybnik Power Plant
Only in 2020 we have completed the following tasks:
- Disassembly of the Heat Recovery Steam Generator (Boiler) after Solar Titan gas turbine to P.P.U Energorem (contractor) in Heinsberg, Germany
- Mechanical and electrical part of filter modification
- Assembly and assembly -welding works in Mondi Dynas Vaja in Sweden.